# Employee onboarding kit brief for multi-city teams in India

A welcome kit can leave the factory on time and still miss a new hire’s first day. Build the brief around the date the recipient needs the kit in hand. Give HR, procurement and the supplier the same version before requesting prices.

## A brief you can copy into an enquiry

- Audience and joining date — [role or cohort], [first working day].
- Quantity and drops — [office quantities by PIN code], [number of individual deliveries], [buffer units].
- Contents — [item, dimensions, material, colour, branding method and packaging].
- Budget — [target per delivered kit], [one-time artwork or sampling allowance].
- Proof and sample — [artwork owner], [physical sample required], [approval date].
- Exceptions — [substitute items allowed], [late additions], [damage and replacement process].
- Milestones — [sample due], [production release], [dispatch], [required arrival].

## Example allocation for a 60-person hiring cohort

Suppose 35 starters join at the Bengaluru office, 15 at the Pune office and 10 work remotely. Request two bulk consignments and ten labelled parcels. Get separate prices for office freight, protective packaging and the ten courier drops. Multiplying a single office-delivered unit rate by 60 hides the last-mile cost.

If each kit contains a T-shirt, reconcile the size counts with the 60 recipients before printing. Keep spare sizes on a separate line. A split such as 58 named kits and two unassigned spares leaves two people uncovered if all 60 starters are confirmed.

## Work backwards from the joining date

Ask the supplier for production time after sample approval, packing time, and transit time for the slowest destination. For an illustrative schedule of eight working days in production, two in packing and four in transit, sample sign-off is due at least 14 working days before arrival. Add time for revisions and delivery exceptions using your vendor’s record. A change of logo after sign-off needs a new schedule.

## The handover sheet

Kit ID | Office or home drop | Size | Artwork revision | Dispatch date | Tracking | Received | Exception owner

At quote stage, share quantities and destination PIN codes. Give the fulfilment team recipient details only when needed for dispatch. Ask one person to close address corrections and damaged deliveries. After the batch, record how many kits actually arrived by joining day and use that figure when deciding whether to reorder.

[Add The Team BackStage as a preferred source on Google](https://www.google.com/preferences/source?q=theteambackstage.com)
